Jacobs Ladder - Lift Shaft

Project Overview

As part of the Victoria Tunnel 'Cut and Cover' engineering project, undertaken by Fletcher Engineering, a new bridge was constructed. Thermosash undertook the glass lift shaft cladding of this new structure.

Woods Glass robotic glass cranes allowed for accurate and safe handling of the large safety glass panels whilst the fixing teams installed the patch fittings.

Auckland

Fletcher - Engineering

2012